Southwest LRT Progress (METRO Green Line Extension)
Following the progress of the Southwest LRT.
The extension to the existing green light rail line is planned to begin operating in 2023. Servicing stations in Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
The project includes 29 new bridges, 7 bridge modifications, 6 pedestrian tunnels, 2 rail tunnels, and more than 100 retaining walls.
Read MoreThe extension to the existing green light rail line is planned to begin operating in 2023. Servicing stations in Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
The project includes 29 new bridges, 7 bridge modifications, 6 pedestrian tunnels, 2 rail tunnels, and more than 100 retaining walls.